• Upgrade of SDCC Globus endpoint on May 31st 2022

    Duration:
    6/1/2022 9:00 am — 6/1/2022 9:00 am

    Group Responsible:
    IT Services

    Affected Area:
    Globus File Transfers

    Expected Impact:
    User to use new severs/services

    Maintenance Type:
    Transparent Upgrage/Maintenance

    Description:
    Upgrade of SDCC Globus endpoint on May 31st 2022.

    The SDCC Globus endpoint is moving to version 5.4 and will require MFA for all file transfers. Currently two SDCC endpoints are available but after May 31st the old SDCC endpoint (d6ae63d8-503f-11e9-a620-0a54e005f950) will be retired and deleted. Please test and use the new SDCC endpoint for all file transfers (12782fb1-a599-4f18-b0fb-2e849681e214).

    See documentation for more details.

    https://www.sdcc.bnl.gov/information/services/globus-file-transfer-0

    Please send questions to RT-SDCC-Cluster@bnl.gov

  • US-ATLAS dCache Maintenance

    Duration:
    5/17/2022 9:00 am — 5/17/2022 1:00 pm

    Group Responsible:
    Services & Tools

    Affected Area:
    US-ATLAS dCache

    Expected Impact:
    dCache storage not accessible

    Maintenance Type:
    Planned Maintenance/Downtime

    Description:
    The US-ATLAS dCache storage element will be upgraded to the latest dCache version (7.2.16). The ATLAS dCache service hosted at BNL will not be accessible during the upgrade. Anticipated downtime is less than 4 hours.

  • Upgrade of SDCC Globus endpoint on May 31st 2022

    Duration:
    5/31/2022 9:00 am — 5/31/2022 9:00 am

    Group Responsible:
    IT Services

    Affected Area:
    Globus File Transfers

    Expected Impact:
    Use of new Globus procedures

    Maintenance Type:
    Transparent Upgrage/Maintenance

    Description:
    The SDCC Globus endpoint is moving to version 5.4 and will require MFA for all file transfers. Currently two SDCC endpoints are available but after May 31st the old SDCC endpoint (d6ae63d8-503f-11e9-a620-0a54e005f950) will be retired and deleted. Please test and use the new SDCC endpoint for all file transfers (12782fb1-a599-4f18-b0fb-2e849681e214).

    See documentation for more details.

    https://www.sdcc.bnl.gov/information/services/globus-file-transfer-0

  • Shutdown of astroftp.rhic.bnl.gov and rcf3.rhic.bnl.gov

    Duration:
    4/4/2022 9:00 am

    Group Responsible:
    IT Services

    Affected Area:
    SFTP Services interactive logins being replaced

    Expected Impact:
    User to use new servers/services

    Maintenance Type:
    Information

    Description:
    On 4/4/2022 @ 9 AM astroftp.rhic.bnl.gov and rcf3.rhic.bnl.gov will be retired/shut down permanently and user should migrate all files/work to the replacement server/servers on cftp.sdcc.bnl.gov, sftp.sdcc.bnl.gov for data transfers (to replace astroftp), NX, tex and nxcamput01 for interactive logins (to replace rcf3).

  • BNL Box Service Restored 3/10/22 6:45 PM

    Duration:
    3/10/2022 6:45 pm

    Group Responsible:
    Services & Tools

    Affected Area:
    BNL Box

    Expected Impact:
    BNL Box sync and share service now available

    Maintenance Type:
    Information

    Description:
    The BNL Box service has been restored and is now running Nextcloud v22. Please check your clients (including mobile) - you may need to log in again and/or update your client to the latest version. There may be lingering issues, so please report any problems encountered via email to RT-RACF-StorageManagement@bnl.gov\n\nWe plan another update to Nextcloud v23 next week, which will be announced in advance. After that, we will be looking at adding new features and capabilities. Thank you for your patience as we navigate this process.

  • Shutdown of astroftp.rhic.bnl.gov and rcf3.rhic.bnl.gov

    Duration:
    3/31/2022 9:00 am — 3/31/2022 9:00 am

    Group Responsible:
    IT Services

    Affected Area:
    SFTP Services & interactive logins being replaced

    Expected Impact:
    User to use new severs/services

    Maintenance Type:
    Transparent Upgrage/Maintenance

    Description:
    On 03/31/2022 @ 9AM astroftp.rhic.bnl.gov and rcf3.rhic.bnl.gov will be retired/shutdown permanently and user should migrate all files/work to the eplacement server/services on cftp.sdcc.bnl.gov, sftp.sdcc.bnl.gov for data transfers (to replace astroftp), NX , tex and nxcampus01 for interactive logins (to replace rcf3).

  • BNL Box Emergency Downtime Today, 3/10/22)

    Duration:
    3/10/2022 10:30 am — 3/10/2022 5:00 pm

    Group Responsible:
    Services & Tools

    Affected Area:
    BNL Box

    Expected Impact:
    BNL Box sync and share service will be unavailable

    Maintenance Type:
    Unplanned/Outage

    Description:
    The BNL Box service will be down today for an unspecified duration starting at 10:00 am in order to perform a series of software upgrades. This emergency action is being mandated by BNL Cyber. We apologize for any inconvenience and will send an update when the work is complete.

  • Changes to ITD-managed BNL Indico

    Duration:
    3/8/2022 8:00 am

    Group Responsible:
    Services & Tools

    Affected Area:
    BNL Indico

    Expected Impact:
    Creation of local Indico accounts disabled

    Maintenance Type:
    Information

    Description:
    As part of the modernization of the ITD-managed Indico services at BNL and in keeping with best practices with regards to access control to collaborative tools, the creation of local Indico accounts will be disabled on Tuesday, March 8th. Please read the full announcement on https://indico.bnl.gov/.

    Indico users may still access Indico with their local accounts until May 31st, 2022. However, all Indico users are urged to switch to federated accounts at their earliest possible convenience. On or about June 1st, Indico access via local accounts will be disabled in its entirety, and access to Indico will only be possible via federated accounts. Acceptable federated accounts include BNL Active Directory, BNL SDCC, InCommon and EduGAIN. It does NOT include Google and other common social media platforms.

    If you do not have access to federated accounts, please refer to the Indico link above for additional information and support.

  • Network Update for cssh01.sdcc.bnl.gov

    Duration:
    2/3/2022 9:30 am — 2/3/2022 9:45 am

    Group Responsible:
    IT Services

    Affected Area:
    SSH Logins/connections

    Expected Impact:
    cssh01.sdcc.bnl.gov will not be available

    Maintenance Type:
    Planned Maintenance/Downtime

    Description:
    The network update postponed last week for cssh01.sdcc.bnl.gov has been rescheduled for tomorrow morning 2/3/22 @ 9:30 AM. SSH connections will not be available for the duration of the update and existing connections will be terminated. cssh02.sdcc.bnl.gov will be available as an alternative.

  • Network Upgrade cssh01 postponed

    Duration:
    1/28/2022 2:30 pm — 1/28/2022 2:45 pm

    Group Responsible:
    Network

    Affected Area:
    SSH logins

    Expected Impact:
    Access to nxcampus01 will be lost and unavailable

    Maintenance Type:
    Planned Maintenance/Downtime

    Description:
    CSSH01.sdcc.bnl.gov will be available and not updated at this time, postponed until further notice, update to nxcampus01 still scheduled.