------------------------------------------------------------ Date: Sat Sep 1 00:08:09 2001, Shift: 16:00-24:00 Supervisor: ZM, with: - Log book#8 pages 50 - 51 Shift Summary: ------------------------------------------------------------ 1. Beam stored and cogged at 19:50. Goog beam up to end of the shift. started at B=13.6x10^9, Y=18.1x10^9 and decreased to B=10.8x10^9, Y=16.0x10^9 2. Two runs (4530 and 4531) with the same setting recorded (About 0.5M trigger #1 event) MRS at 40 deg., no magnetic field, FS at 4 deg, polarity B 1/5 mag. field. 3. No detector problems. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Sat Sep 01 2001 - 00:08:50 EDT