Date: Sat Sep  1 08:00:15 2001, Shift: 00:00-08:00
Supervisor: EJ, with: 
Log book#8 pages 52 - 53
Shift Summary:
------------------------------------------------------------
1. Beam entire shift.
2. Running with D5 with 500 Amps (pol A), the following 
   runs were recorded:
   Run 4532 with 116.000 trigger 1 events
   Run 4533 with  81.000 trigger 1 events
   Run 4534 with  61.000 trigger 1 events
                 -------
   Total of      258.000 trigger 1 events
   Run 4535 is still running.
3. No detector problems noticed. 
------------------------------------------------------------