Shift report 20010901 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat Sep 01 2001 - 23:59:37 EDT

  • Next message: Apache: "Shift report 20010902 00:00-08:00"

    ------------------------------------------------------------
    Date: Sat Sep  1 23:59:37 2001, Shift: 16:00-24:00
    Supervisor: ZM, with: -
    Log book#8 pages 57 - 58
    
    Shift Summary:
    ------------------------------------------------------------
    1. Good beam from 15:00 up to 22:30 when RHIC quench link
       interlock. 
    2. Runs from 4547 to 4550 were collected. In run #4550
       trigger #3 was off. Now, we have about 0.75M events
       for item 2 from the list.
    3. No detector problems.
      
    ------------------------------------------------------------
    