------------------------------------------------------------ Date: Sun Sep 2 07:52:22 2001, Shift: 00:00-08:00 Supervisor: K. Hagel, with: Log book#8 pages 59 - 65 Shift Summary: ------------------------------------------------------------ Beam from 1:15 through 1:55 (Quench Link Interlock ended it) Beam from 4:15 through 7:15 (Quench Link Interlock ended it again) Runs 4553, 4554 and 4556 more or less rounded out the 1M events goal for MRS at 40 deg polarity A. At that point changed D5 to polarity B. Run 4557 ran until Quench Link Interlock It had 177639 trig 1 events. T5 tripped once. In retrospect, it probably happened when the beam dumped. No other detector problems ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Sun Sep 02 2001 - 07:53:12 EDT