Shift report 20000831 16:00-24:00

From: http account (http@pii3.brahms.bnl.gov)
Date: Thu Aug 31 2000 - 00:03:02 EDT

  • Next message: http account: "Shift report 20000831 00:00-08:00"

    ------------------------------------------------------------
    Date: Thu Aug 31 00:03:01 2000, Shift: 16:00-24:00
    Supervisor: yb, with: kh
    Log book#5 pages 55 - 60
    
    Shift Summary:
    ------------------------------------------------------------
    Beam during the entire shift except for 20:20 - 21:50 when
    beam was dumped to make a new store.
    
    The following runs were collected
    run   trigger 1   est. collisions
    2479    387984         254000
    2480    267404         184200
    2481 in progress at shift end; started at 21:50
    These runs were taken with MRS at 45 deg, D5 at 350A
    FFS at 5 deg, D1 at 625A
    
    Slight problem during run 2479.  When trying to navigate
    through the vt terminals to see if any 1458B voltages had
    tripped, window somehow disappeared and HV was turned off.
    That necessitated stopping run 2479 and starting run 2480.
    Problem happened several other times, but did not turn off
    HV in other times.
    
    Beam at shift end is 19.8 E09(B) and 11.4 E09(Y)
    ------------------------------------------------------------
    