------------------------------------------------------------ Date: Thu Aug 31 00:03:01 2000, Shift: 16:00-24:00 Supervisor: yb, with: kh Log book#5 pages 55 - 60 Shift Summary: ------------------------------------------------------------ Beam during the entire shift except for 20:20 - 21:50 when beam was dumped to make a new store. The following runs were collected run trigger 1 est. collisions 2479 387984 254000 2480 267404 184200 2481 in progress at shift end; started at 21:50 These runs were taken with MRS at 45 deg, D5 at 350A FFS at 5 deg, D1 at 625A Slight problem during run 2479. When trying to navigate through the vt terminals to see if any 1458B voltages had tripped, window somehow disappeared and HV was turned off. That necessitated stopping run 2479 and starting run 2480. Problem happened several other times, but did not turn off HV in other times. Beam at shift end is 19.8 E09(B) and 11.4 E09(Y) ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Thu Aug 31 2000 - 01:01:53 EDT