------------------------------------------------------------ Date: Wed Aug 30 16:05:17 2000, Shift: 08:00-16:00 Supervisor: ZM, with: EJK Log book#5 pages 52 - 54 Shift Summary: ------------------------------------------------------------ 1. Continous beam since 13:27 with B=16.7E09, Y=19.7 E09 2. MRS has been moved from 90 to 45 deg. D1(B, 425A), D2(B, 492A), D5(B, 350A) Run # 2478 collected 380K trigger#1 events and stoped at 15:03 Run # 2479 started at 15:05 and still is going 3. No detector problems ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Wed Aug 30 2000 - 16:06:00 EDT