Date: Thu Aug 31 23:59:06 2000, Shift: 16:00-24:00
Supervisor: YB, with: KH
Log book#5 pages 66 - 69
Shift Summary:
------------------------------------------------------------
1. Injection studies most of the time. Beam is on since 9pm 
    Ib=10,000E9, Iy=17,900E9
2. Run2488 173K trig1 vs. 152K collisions. Changed FFS angle
   to 8 degrees, runs 2489 and 2491 is still running.
3. Couldn't turn on D2; called expert, then it happened 
   again. Now is OK. 
4. BFS is stuck at 4 degrees. Several different support 
   came to look at the problem and finally had a short
   access (when RHIC personnel also needed an access).  
   It was determined that problem was beyond the scope
   of their expertise.  An expert will be called in and
   will work on it when it can be coordinated with RHIC
   for another access if that is needed.
5. Implemented unpacking of T5 into BrRawDataInput.
------------------------------------------------------------