------------------------------------------------------------ Date: Thu Aug 31 08:09:49 2000, Shift: 00:00-08:00 Supervisor: FR, with: AJ Log book#5 pages 61 - 64 Shift Summary: ------------------------------------------------------------ 1) Beam available during entire shift except for about an hour (4:30 to 5:30) for a beam dump. 2) - Run 2481 continuing from the previous shift has 654K trigger-1 events and about 420K collisions. - Run 2482 contains 278K trigger-1 events and 178K coll. ... Both above runs taken with MRS at 45deg., FS at 5deg. and Polarity B for D1,D2 and D3. Polarity was then changed from B to A for all 3 magnets. - Run 2483 has 372K trigger-1 events and 238K coll. - Run 2484 started at 7:40, still running. 3) No detector problem. ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Thu Aug 31 2000 - 08:10:26 EDT