T0 Counters
Status Report on PR04 analysis/studies:
Status Report on PR03 analysis/studies:
PR01 Analysis
T0 Upgrade
First version of design
of the T0 mounting frame (April 20, 2002)
Front and site view of
the T0 mounting frame (April 25, 2002)
Constraints imposed on
the T0 array design due to ring 2 and ring 3 (April 29, 2002)
View of the IR
(May 2, 2002)
Magnetic
field around the P-side enclosure (May 16, 2002)
Floor space for
T0 stands (May 17, 2002)
T0 upgrade presentation
(June 6, 2002)
T0 frame and
support design (June 22, 2002)
T0 base
issues (July 24, 2002)
T0 almost final
design (July 26, 2002)
Final design T0
support structure (August 1, 2002)
Construction of
T0 bases finished (September 12, 2002)
T0 arrays
installed in the IR (November 12, 2002)
Final design
drawings T0 arrays (as build).