The T0 arrays were installed in the IR on Tuesday November 12, 2002. The arrays are installed behind ring 2 on the P side and behind ring 3 on the N side. On this page, several pictures of the arrays in the IR are shown.
![]() |
![]() |
Location of the T0 array, to be installed behind ring 2 on the P side.
|
The T0 frame and based installed behind ring 2 on the P side.
|
![]() |
![]() |
Ray Teng making sure that the PMT cables are properly strain
relieved. |
The T0 array on the P side, fully installed! |
![]() |
![]() |
The T0 frame and based installed behind ring 3 on the N side. |
The T0 array on the N side, fully installed!
|
![]() |
![]() |
The T0 array on the N side, fully installed! |
The T0 array on the N side, fully installed! |