------------------------------------------------------------ Date: Sun Mar 7 23:58:16 2004, Shift: 16:00-24:00 Supervisor: HB, with: FH Log book#15 pages 78 - 78 Shift Summary: ------------------------------------------------------------ 1. Beam from 16 to 16:55 and 21:44-24, a total of 3h 2. run tr2 tr3 10818 69k 103k 10819 25k 63k 10820 non-TPC pedestal 10821 TPC pedestal 10822 bad run 10823 72k 103k 10824 in progress 3. No detector problems ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sun Mar 7 23:58:30 2004
This archive was generated by hypermail 2.1.8 : Sun Mar 07 2004 - 23:58:52 EST