[Brahms-l] Shift report 20040307 16:00-24:00

From: Apache <apache@bnl.gov>
Date: Sun Mar 07 2004 - 23:58:16 EST
------------------------------------------------------------
Date: Sun Mar  7 23:58:16 2004, Shift: 16:00-24:00
Supervisor: HB, with: FH
Log book#15 pages 78 - 78

Shift Summary:
------------------------------------------------------------
1. Beam from 16 to 16:55 and 21:44-24, a total of 3h

2. run     tr2   tr3
   10818    69k   103k
   10819    25k   63k
   10820     non-TPC pedestal
   10821     TPC pedestal
   10822     bad run
   10823    72k   103k
   10824    in progress

3. No detector problems
------------------------------------------------------------