[Brahms-l] Shift report 20040307 08:00-16:00

From: Apache <apache@bnl.gov>
Date: Sun Mar 07 2004 - 15:57:51 EST
------------------------------------------------------------
Date: Sun Mar  7 15:57:50 2004, Shift: 08:00-16:00
Supervisor: hiro, with: 
Log book#15 pages 78 - 78

Shift Summary:
------------------------------------------------------------
1. Beam for 5hr
   control failure for 3hr
2.  RUN10816-10818
3.  None detected.
------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Sun Mar 7 15:58:03 2004

This archive was generated by hypermail 2.1.8 : Sun Mar 07 2004 - 15:58:23 EST