[Brahms-l] Shift report 20040229 08:00-16:00

From: Apache <apache@bnl.gov>
Date: Sun Feb 29 2004 - 16:17:48 EST
------------------------------------------------------------
Date: Sun Feb 29 16:17:48 2004, Shift: 08:00-16:00
Supervisor: YKL, with: PJ
Log book#15 pages 70 - 70

Shift Summary:
------------------------------------------------------------
1. 6.5 hours of good beam.

2. MRS @40 deg, B1050;
   FS @8 deg, B1723;

Run 10681  Tr2=43  Tr3=116;
Run 10682      46      158;
Run 10685     101      167;
Run 10689      49      162;

Run 10683 TPC ped;
Run 10689 non-TPC ped;

3. FV worked on TRFS. Default settings
of TRFS HV have been changed.
------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Sun Feb 29 16:17:59 2004

This archive was generated by hypermail 2.1.8 : Sun Feb 29 2004 - 16:18:30 EST