[Brahms-l] Shift report 20040229 16:00-24:00

From: Apache <apache@bnl.gov>
Date: Sun Feb 29 2004 - 23:59:05 EST
------------------------------------------------------------
Date: Sun Feb 29 23:59:05 2004, Shift: 16:00-24:00
Supervisor: rw, with: kh
Log book#15 pages 71 - 71

Shift Summary:
------------------------------------------------------------
1. Beam from 17:50 to 20:30 and
   22:00 to 24:00 (total 4 hr 40 min)

2.  FS 8deg.@B1723   MRS 40deg@B1050 
   run     tr2    tr3
  10690    57K    108K
  10691    40K    105K
  10692    32K    110K
  10693    19K    68K
  10694    TPC pedestal
  10695    Non-TPC pedestal
  10696    75k    152k
  10697    in progress

3. No detector problem.
------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Sun Feb 29 23:59:20 2004

This archive was generated by hypermail 2.1.8 : Sun Feb 29 2004 - 23:59:43 EST