------------------------------------------------------------ Date: Sun Feb 29 08:12:26 2004, Shift: 00:00-08:00 Supervisor: rw, with: Log book#15 pages 70 - 70 Shift Summary: ------------------------------------------------------------ 1. Beam is on from the previous shift to 0:30, from 1:00 to 5:00 and from 5:40 to the end of the shift. A very nice shift. 2. run tr2 tr3 10667 22k 55k FS 8deg@1723B MRS 40deg.@2255B 10668 TPC Pedestal 10669 Non-TPC Pedestal 10670 81k 99k 10671 88k 136k 10672 62k 117k 10673 50K 125k 10674 12k 50k MRS 10M events completed. 10675 TPC Pedestal 10676 Non-TPC pedestal 10677 92k 202k MRS 40deg.@1050B FS are as before 10679 50k 110k 10680 running 3, no detector problem. 4. DAQ run error occured and can't start a new run. Isoserver and run server restarted. The error resumed. ------------------------------------------------------------ _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sun Feb 29 08:13:16 2004
This archive was generated by hypermail 2.1.8 : Sun Feb 29 2004 - 08:13:31 EST