Shift report 20030204 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Feb 04 2003 - 23:52:09 EST

  • Next message: Apache: "Shift report 20030205 00:00-08:00"
    ------------------------------------------------------------
    Date: Tue Feb  4 23:52:09 2003, Shift: 16:00-24:00
    Supervisor: PS, with: ZM
    Log book#13 pages 148 - 149
    
    Shift Summary:
    ------------------------------------------------------------
    1. No beam during this shift
    2. 7787 none TPC pedestal run
       7788 TPC pedestal run
       7789 DVM run
    3. Some problems with connection to MRS1440 and FFS1440 main      frames (see elog for details)
    ------------------------------------------------------------
    


    This archive was generated by hypermail 2.1.5 : Tue Feb 04 2003 - 23:57:04 EST