From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Feb 04 2003 - 23:52:09 EST
------------------------------------------------------------ Date: Tue Feb 4 23:52:09 2003, Shift: 16:00-24:00 Supervisor: PS, with: ZM Log book#13 pages 148 - 149 Shift Summary: ------------------------------------------------------------ 1. No beam during this shift 2. 7787 none TPC pedestal run 7788 TPC pedestal run 7789 DVM run 3. Some problems with connection to MRS1440 and FFS1440 main frames (see elog for details) ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Tue Feb 04 2003 - 23:57:04 EST