From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Feb 04 2003 - 16:05:57 EST
------------------------------------------------------------ Date: Tue Feb 4 16:05:57 2003, Shift: 16:00-24:00 Supervisor: ykl, with: Log book#13 pages 147 - 147 Shift Summary: ------------------------------------------------------------ 1. Good beam until 11:15. Magnet and control problem for the rest of the time. 2. MRS 45 deg 500A, FS 8 degree 1/8B. Run 7779 (MRS 290K, FS 84K). Run 7780 (MRS 124K, FS 36K). Plan for: 500K at MRS 40 deg 1050A, continue for 130K at FS 8 deg 1/8A. Ped and DVM Run 7781(non-TPC Ped run). Run 7782(very short TPC ped run). Run 7783(TPC ped run). Run 7784(DVM run). 3. No detector problem. ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Tue Feb 04 2003 - 16:06:25 EST