From: Apache (apache@pii3.brahms.bnl.gov)
Date: Wed Feb 05 2003 - 07:54:29 EST
------------------------------------------------------------ Date: Wed Feb 5 07:54:28 2003, Shift: 00:00-08:00 Supervisor: ZY, with: Log book#13 pages 148 - 148 Shift Summary: ------------------------------------------------------------ 1. Beam on from 0:15 to 3:40. 2. Data runs (MRS at 45 degree A1050, FS at 8 degree 1/8B) Run 7790 (trig. 3 212K, trig. 6 51K) Run 7795 (trig. 3 239K, trig. 6 57K) Pedestal runs: Run 7796--TPC pedestal run Run 7797--non-TPC pedestal run Run 7798--DVM run 3. No detector problem. 4. For MRS 45 deg. A1050, need another 50K For FS 8 deg. 1/8B, another 22K needed according to the plan. ------------------------------------------------------------
This archive was generated by hypermail 2.1.5 : Wed Feb 05 2003 - 07:55:24 EST