Shift report 20020110 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Thu Jan 10 2002 - 00:08:43 EST

  • Next message: Apache: "Shift report 20020110 00:00-08:00"

    ------------------------------------------------------------
    Date: Thu Jan 10 00:08:43 2002, Shift: 16:00-24:00
    Supervisor: IGB, with: Mads
    Log book#12 pages 34 - 36
    
    Shift Summary:
    ------------------------------------------------------------
    Machine Status:
    No beam until 2205, since then the beam has been just fine.
    
    Achievements:
    Woke Flemming.
    Woke Ramiro.
    Disturbed the magnet watch.
    Started data taking at 2350.
    
    Detector Problems:
    When the beam finally was ready, I turned on the TPCs, and then
    started BADTRIP.  BADTRIP immediately began to make its annoying
    beeping noise, because all of the Drift voltages (that is on all TPCs)
    were 0 V, rather than the requested (and somewhat more useful) -4980V.
    After trying to solve this, I called Flemming and woke him up, and he
    told me to call Ramiro, who I think I also woke up.  The short story:
    to get the drift voltage on, I had to cycle the power on the L1458a.  
    This only took about an hour.  Then I noticed that D2 had no current.
    There was a problem with D2, and it was solved by the magnet guys. 
    As I write this, things seem to be running smoothly so I will retreat
    and let Kris deal with this wonderfully running experiment.
    ------------------------------------------------------------
    