------------------------------------------------------------
Date: Thu Dec 27 08:04:44 2001, Shift: 00:00-08:00
Supervisor: JH Lee, with: 
Log book#11 pages 98 - 100
Shift Summary:
------------------------------------------------------------
1. ~ 4 hrs beam for physics
    (access, setup, polarization measurements)
2. Physics Data:
   runs: 6165, 6166, 6167
  
   ~10K MRS tiggers
   ~35K FS triggers
   MRS trigger Rates:
   MRS/Sync = 0.9 before steering
   MRS/Sunc = 1.6 after steering 
   If MRS/Sync ~< 1, Ask MCR to steer the beam
 
3. No new detector problems 
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Thu Dec 27 2001 - 08:05:14 EST