------------------------------------------------------------ Date: Thu Dec 27 03:29:07 2001, Shift: 16:00-24:00 Supervisor: fv, with: Log book#11 pages 96 - 97 Shift Summary: ------------------------------------------------------------ Beam off, when I came in (store aborted at ~15.30) 16:35 Snake quenchlink in sector 3. Estimated time for injection 17:30 Beam studies scheduled for tomorrow Dec 27 (8-14) mainly at injection energy. Shift will be on standby until noon. Plan for shift: a) Add rhic clock (blue of yellow) to Inel trigger b) check effect of adding in theneartest two (L1 and R1) to trigger (should improve eff by ~ *2, and according to pp2pp only add a few percent of wrong 16:55 Did one more attempt to turn on/off the 1458B. It still gives the Bad 24V. Thermal overload ? Turned off until access can be made. 17:05 HV check performed. 18:20 Beam cogged and stored. (99 GeV) 18:40 starting physics run. Run 6157 - scaledown 100, 100, 1, 1. 18:50 The trigger six rates does not look right. Somehow there are more 3's than 6' Discard run 6157- bad timing!! 19:15 start run 6158. (8 deg 1/8 B no BFS, 90 deg 350A - B pol.) Blue life time is not good. Coin rate i.e. Inel decya's rapidly ~500 at 19.50 The spec eff is smaller for this store ~ 777/1800 (40%) for FS Trigger 3/trigger6 ~ 1/3. 20:15 Stop run 6158 - MCR called for start of pol. measurements. Will use time to look if L1 and R1 can be added into trigger (for higher eff trigger) 20:40 Polarization measurements completed. MCR called plan to hold store until ~ 23.00 where STAR+Phenix has requested access. 20:45 Run 6159 started down scale 1: 100 5 :20 3 and 6 : 1 20:47 Lpd print server was stopped. - restarted (as su) 22:35 MCR announced another pol measurement. Stop data run.6159 22:40 Start run 6160 Checkout of data quality during polarization measurements. The run stopped at 23:05. Should not be used for physics analysis Adjusting timing during this run. 23:05 Finished sdjusted the timing for trigger 6 start. It was quite late ~ 24 nsec. 23:06 Start run 6161 same trigger mix as before. 23:10 Announchment made for starting access at midnight (1 (2?) hours) Beam will go onto 23:55 Run summary: Run 6158 tr1-28.6K tr3 - 2914K tr 5 47.8 K tr 6 10271 (1.0 h) Run 6159 tr1 66.8K tr 3 3717 tr 5 212K tr 6: 13613 (1:50h) Run 6161 still going at midnight 8 deg 1/8B ~50k trigger 6 (get to 300K) 90 deg 2B ~10k trigger 3 (get to 300K) Beam Summary: 18:40-19:15 Bad run (trigger problem) 19:15-20:15 Data run 20:45 - 22:40 Data run 23:05 - 24:00 Data run Accomplishments - The rhic clock was added to the Inel trigger. - trigger 6 timing adjusted. - The gitter between different L1.R1 makes it difficult to include until we have TDC information for all channels. Open Work to do: schedule access for HV repair (RAS+..- request 2-3 hours) string the Inel counter tdc delay cables (ready on spool in FEH). Beam Hour this shift (16-24) 4.5 h ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Thu Dec 27 2001 - 03:29:48 EST