------------------------------------------------------------
Date: Thu Dec 27 03:29:07 2001, Shift: 16:00-24:00
Supervisor: fv, with: 
Log book#11 pages 96 - 97
Shift Summary:
------------------------------------------------------------
Beam off, when I came in (store aborted at ~15.30)
16:35 Snake quenchlink in sector 3. Estimated time for injection 17:30
Beam studies scheduled for tomorrow Dec 27 (8-14) mainly at injection energy.
Shift will be on standby until noon.
Plan for shift:
a) Add rhic clock (blue of yellow) to Inel trigger
b) check effect of adding in theneartest two (L1 and R1) to trigger
   (should improve eff by ~ *2, and according to pp2pp only add a few 
   percent of wrong
16:55 Did one more attempt to turn on/off the 1458B. It still gives the
      Bad 24V. Thermal overload ? Turned off until access can be made.
17:05 HV check performed.
18:20 Beam cogged and stored. (99 GeV)
18:40 starting physics run.
      Run 6157  - scaledown 100, 100, 1, 1.
18:50 The trigger six rates does not look right. Somehow there are more 3's than 6'
      Discard run 6157- bad timing!!
19:15 start run 6158.  (8 deg 1/8 B no BFS, 90 deg 350A - B pol.)
      Blue life time is not good.
      Coin rate i.e. Inel decya's rapidly ~500 at 19.50
      The spec eff is smaller for this store ~ 777/1800 (40%) for FS
      Trigger 3/trigger6 ~ 1/3.
20:15 Stop run 6158 - MCR called for start of pol. measurements.
      Will use time to look if L1 and R1 can be added into trigger (for higher eff
      trigger)
20:40 Polarization measurements completed.
     	MCR called plan to hold store until ~ 23.00 
	where STAR+Phenix has requested access.	
20:45 Run 6159 started
      down scale 1: 100 5 :20 3 and 6 : 1
20:47 Lpd print server was stopped. - restarted (as su)
22:35 MCR announced another pol measurement.
      Stop data run.6159
22:40 Start run 6160
      Checkout of data quality during polarization measurements.
      The run stopped at 23:05. Should not be used for physics analysis
      Adjusting timing during this run.
      
23:05 Finished sdjusted the timing for trigger 6 start.
      It was quite late ~ 24 nsec.
23:06 Start run 6161
      same trigger mix as before.
23:10 Announchment made for starting access at midnight (1 (2?) hours)
      Beam will go onto 23:55
Run summary:
     Run 6158  tr1-28.6K tr3 - 2914K tr 5 47.8 K tr 6 10271 (1.0 h)
     Run 6159  tr1 66.8K tr 3  3717  tr 5 212K   tr 6: 13613 (1:50h)
     Run 6161  still going at midnight
     8 deg  1/8B  ~50k trigger 6 (get to 300K)
     90 deg 2B    ~10k trigger 3 (get to 300K)
Beam Summary:
     18:40-19:15   Bad run (trigger problem)
     19:15-20:15   Data run 
     20:45 - 22:40 Data run
     23:05 - 24:00     Data run
Accomplishments
    - The rhic clock was added to the Inel trigger.
    - trigger 6 timing adjusted.
    - The gitter between different L1.R1 makes it difficult to include until
      we have TDC information for all channels.
Open Work to do:
    schedule access for HV repair (RAS+..- request 2-3 hours)
    string the Inel counter tdc delay cables (ready on spool in FEH).
Beam Hour this shift (16-24)
     4.5 h 
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Thu Dec 27 2001 - 03:29:48 EST