Shift report 20011027 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat Oct 27 2001 - 00:10:55 EDT

  • Next message: Apache: "Shift report 20011027 00:00-08:00"

    ------------------------------------------------------------
    Date: Sat Oct 27 00:10:55 2001, Shift: 16:00-24:00
    Supervisor: DO, with: 
    Log book#10 pages 59 - 60
    
    Shift Summary:
    ------------------------------------------------------------
    1.Machine status:
      After a couple of unsuccessful ramps, MCR could store
      the beam from 19:00 to 20:30. They dumped for a RHIC 
      cryo ring access. They completed the access at 21:15    
      and the next store (beam cogged) started around 22:10. 
      Still running.
    
    2.Achievements:
                Trig 1     Trig 6
      Run 5525 stopped after 10mn: trigger 7 downs scale was 1
      Run 5526    261k        84k  
      Run 5527    267k        85k
      Run 5528 still running (77k - 25k)  
    
    3.Detector problems:
      The only bad thing I could notice is the absence
      of signals in TDC TOFW Top tube 92. Otherwise, things
      are in a good shape.  
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Sat Oct 27 2001 - 00:12:13 EDT