Shift report 20011027 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat Oct 27 2001 - 08:18:43 EDT

  • Next message: Christian Holm Christensen: "RE: TOFW Pid"

    ------------------------------------------------------------
    Date: Sat Oct 27 08:18:43 2001, Shift: 00:00-08:00
    Supervisor: JC, with: 
    Log book#10 pages 61 - 62
    
    Shift Summary:
    ------------------------------------------------------------
    1. 
    Quite a good store continued from the previous shift. 
    Around 2 am Brahms and Phenix voted to dump. 
    Rhic delivered a new beam at 4:45 but 15 minutes later 
    the beam was dumped abruptly without warning (run 5534). 
    Reason: "Cryogenic problems. Cryo permit pulled by 
    leadflow problem".
    
    2. 
    Three data runs:
                  Trig 1     Trig 6
      Run 5528    192k         60k
      Run 5529     93k	   25k
      Run 5534     70k	   22k  	
    
    Pedestals and DVM runs: 5531-5533.
    
    3.
    Dead channel in TOFW Top tube 92.
    No other detector problems.
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Sat Oct 27 2001 - 08:19:14 EDT