Shift report 20010814 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Aug 14 2001 - 00:08:47 EDT

  • Next message: Hironori Ito: "ADC Gate Timing!!!!!!!!"

    ------------------------------------------------------------
    Date: Tue Aug 14 00:08:46 2001, Shift: 16:00-24:00
    Supervisor: Hans Boggild, with: Alexander Madsen
    Log book#7 pages 72 - 78
    
    Shift Summary:
    ------------------------------------------------------------
    1. Stable beams at 20.30. DX problems -> D0 up & DX down ->
       a machinsetting with a finite crossing angle : 2*1.8 mr
    2. Run 4165 - C1 timed in. Problems with ZDC timing. 125000 t
       Run 4167 stopped with fb3 error. 44000 trigs
       Run 4168 started (at 23.43).
    3. T2A shaky - run with +400V fieldw and 1350->1400V anode
       ZDC problems
       Crossing angle -> narrow diamond ???
    
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Tue Aug 14 2001 - 00:09:35 EDT