    Shift Summary:
    ------------------------------------------------------------
    1. Problem with DX magnet, then with weather, no beam all shift
    2. No runs except of pedestal:#4152 & #4153.
    3. No detector problems, RD worked on T1. Magnet Watch
    looked at D2 and they are still working with D3.
    ------------------------------------------------------------
    