------------------------------------------------------------ Date: Fri Aug 18 23:58:39 2000, Shift: 16:00-24:00 Supervisor: EJK, with: DB, RD, mouse/rain Log book#4 pages 117 - 122 Shift Summary: ------------------------------------------------------------ 1. Quench link interlock for a hour. Beam was cogged from 22:10 to 22.40, and then message was "Beam will be dumped : preparing ring entry for cryo". 2. 30 minitues beam, RUN 2348, about 5K collision. 3. Ramiro swapped a FEE card at 17:10 DB found scaler 5 counts which is trigger 1 at "NO BEAM". He cycled crate power and problem went away.(p119) At 22:30, T1 trip, Ramiro came. - channel G16,17,18 failed to load HV. - All Voltage in T1 are OFF!!! ------------------------------------------------------------