------------------------------------------------------------ Date: Sat Aug 19 07:53:00 2000, Shift: 08:00-16:00 Supervisor: sjs, with: sjs,b4 Log book#4 pages 123 - 124 Shift Summary: ------------------------------------------------------------ 1. One 25 min. useful store, otherwise each time beam cogged it was almost immediately dumped because of "controls failure". Three such aborted stores during shift. 2. Run 2349 with 21163 collisions. 3. BBL tubes not holding voltage. After resetting 17 tubes during shift, 10 tubes (not all the same) were found to have tripped about an hour later. Dana has logged a "high priority access" call with the MCR for T1. ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Sat Aug 19 2000 - 09:30:19 EDT