------------------------------------------------------------ Date: Fri Aug 18 16:52:30 2000, Shift: 08:00-16:00 Supervisor: sjs, with: ykl Log book#4 pages 115 - 117 Shift Summary: ------------------------------------------------------------ 1. Beam was dumped at 9:35 due to cryogenic problem. Transition study until end of the shift. 2. Run 2339 (about 1 hr) with cogged beam at 65.12 GeV, MRS at -2 KG. Trigger 5 downscale set to 500. Estimate of #collision = 100000 (based on replay of 1 out of 33 sequences) 3. No new problems. However, it appears that the run ntuples, even for a one hour run (33 sequences), are too large for the SummaryPlots program (it crashes.) SummaryPlot does work if only a few sequences are replayed. ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Fri Aug 18 2000 - 16:56:41 EDT