------------------------------------------------------------ Date: Tue Jun 27 23:46:24 2000, Shift: 16:00-24:00 Supervisor: FR, with: ZIS Log book#1 pages 90 - 90 Shift Summary: ------------------------------------------------------------ - Machine was down at the beginning of the shift (power dip). At 18:30 MCR started machine setup, then they tried to ramp to g=70 but the ramp failed. At 22:30, another unsuccessful ramp (yellow beam did not survive). Current status is "Ramping magnets down". - Runs 1563 and 1564 are pedestal runs. - No detector problems to report. TPC anode voltages are OFF. ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Tue Jun 27 2000 - 23:50:18 EDT