On Tue, Jun 27, 2000 at 04:03:22PM -0400, http account wrote: > > ------------------------------------------------------------ > Date: Tue Jun 27 16:03:21 2000, Shift: 08:00-16:00 > Supervisor: Roy Wada, with: T.K > Log book#2 pages 86 - 87 > > Shift Summary: > ------------------------------------------------------------ > 1.Machine was running in good condition until 12:10. Machine went into POWER DIP (Power failuire including Tandem) > No recovery nor no announcement for recovery has been made. > Run 1554 is a good run. It containes about 9000 collisions. > ------------------------------------------------------------ Note: the power dip also tripped all our VME crates (CAMAC, SC and TPC) and all 3 L1440 high voltage mainframes. The SC and TPC VME crates had to be powered up manually and SBE6 in CAMAC had to be manually rebooted (reset) before the DAQ could run. The L1440 mainframes were discovered and turned on by the 16-24 shift. -- Konstantin Olchanski Physics Department, Brookhaven National Laboratory, Long Island, New York olchansk@bnl.gov
This archive was generated by hypermail 2b29 : Tue Jun 27 2000 - 21:30:19 EDT