Phobos Engineering Run: May 15-August 15 1999

Page last modified on Tuesday, August 19, 2014 at 03:52:39 PM

 

Shift Logbook

bullet

Display Comments from the Shift Logbook, today

bullet

Display Comments from the Shift Logbook, last 7 days

bullet

Enter Shift Comments

bullet

Complete Shift Logbook

Run Logbook:

bullet

Run Logbook, last 50 runs

bullet

Pedestal Runs among last 100 runs

bullet

Calibration Runs among last 100 runs

bullet

Cosmic/Beam Runs among last 100 runs

bullet

Complete Run Logbook

Computer Monitoring

bullet

Slow Monitoring of Detector

bullet

On-line Monitoring Histograms

Documentation:

bullet

Online Monitoring

bullet

Data Acquisition

bullet

DAQ/trigger notes/problems

bullet

Changes in the data format.

bullet

Analyzing the data on RCF

bullet

Offline Data Validation

Hardware Configuration:

bullet

Connection Maps

Shifts:

bullet

Shift Schedule

bullet

Shift Checklist

bullet

The Experts

Recent progress from the engineering run

bullet

Progress Page

 

bulletDetector Elements
bulletSoftware Elements