Shift Instructions
Contents
Data-taking instructions are here.
The console area is to be kept clear of all but shift personnel and necessary
"experts" during regular shifts.
- At the start of shift come 10 minutes early to talk to previous shift crew.
- At the start of shift read comments from the logbook for the last 24 hrs.
- Read the daily schedule, and what to do on next access pages.
- Read "Emergency First Response" posted on shelves just to the left of the
logbook computer, if you have already not done so.
- Take data during entire shift if possible! Write beam momentum as seen on RHIC video for
both beams at beginning of run in run logbook. We are looking for latch-ups as well as
collisions. This can be done even if beam unstable.
- If the conditions in RHIC change, stop and start a new run and note this in the logbook.
- The checklist is to be performed every 2 hours (click the following to see how to perform checklist). When you have
finished the checklist, write in the logbook that you have completed it, and write any
associated appropriate comments. If you find the documentation/checklist unclear etc email
the appropriate person with your comments, and ensure it gets taken care of.
- On the checklist page there is a time option, entitled "Regular". Look at this
page to determine what needs to be done regularly on shift (i.e. every few minutes)
- At the end of shift write any appropriate comments in logbook.
Regular Activities during shift and Things To Pay Attention To
- Every hour, write down the beam rate per minute, and record this
in the logbook.
- Monitor gamma of beam. Record yellow and blue beam energy at
start of each run in the Run Logbook (not shift logbook). Keep the crossing clock time
constant set for current RHIC beam energy.
- Determine whether a Fastbus pedestal run is required, and if required, collect
Fastbus pedestals and and analyze them. Pedestal runs need to be taken on a daily
basis. To determine when the last calibration run was taken, select "Complete
Run Logbook" from the portal and determine when the date of the last Fastbus pedestal
run (FBPED). The calibration runs can only be carried out between stable beam
running conditions. Calibrations runs collected while beams are present can not be
used to determine pedestals. Pedestal data can be collected easily by setting the
run type to FBPED (for
instructions click here). The pedestal data can be analyzed immediately (for
instructions click here).
- If there is no beam in the area, please read the documentation and write to the author
requesting the improvements you desire.
- Ensure you are aware of what RHIC is doing, and if they are working on something new ,
write a comment in logbook. (Note: RHIC video is not always up to date)
- If Plectron has a flashing red light, ascertain why, and, when satisfied, reset it.
(Mondays after 12 pm test it needs to be reset)
- Read the comments from logbook for the last 24 hrs. Check the daily schedule.
- Read "Emergency First Response" posted on shelves just to the left of the
logbook computer, if you have already not done so.
- Perform the checklist (click the following to see how to perform checklist).
- Write in the logbook that you completed the checklist, and any associated appropriate
comments.
- If you find the documentation/checklist unclear etc email the appropriate person with
your comments, and ensure it gets taken care of.
- If Plectron has flashing red light, ascertain why, and, when satisfied, reset it.
(Mondays after 12 pm test it needs to be reset)
- Go to the counting house portal.
- Under "Shift Activities" click on Check List.
- Choose the type of shift you are on.
- Choose the time period you want checklist for, then hit "Display Checklist".
At the start of shift, choose once per start of shift checklist.
Every 2 hours after start of shift checklist, choose the once per 2 hours checklist
Note: There are links on this page that direct you to instructions that describe the
checklist for each system.
- Hit the print button, and print out the checklist
- Perform the checklist for each subsystem, writing answers on the checklist
- When finished, hole punch the checklist and put the checklist into Folder with other
checklists
- If you had problems with the documentation etc, please send an email to the appropriate
responsible individual.
- Check the next access list.
- Find out the amount of time permitted, and call the personnel necessary.
- Inform the operations manager.
- For controlled access:
- Keep to a minimum the number people going in.
- Those people should go to MCR and get a key.
- When they come back from MCR they should inform the shift leader that
they are going in, and exactly how long and what they are going to do.
- They enter area (stand at gate and call x7400 and follow
instructions)
- When finished inside stand at gate, and call x7400 and follow
instructions
- Personnel report back to shift leader what happened
- Shift leader, or person whom entered, write comment in logbook
- Persons with keys should return them to MCR asap.
- On any page to get back to the previous page, click on the page on the right mouse
button, this will drop down a menu, from which you can select back, to goto the previous
page
- If click on the X in the right hand upper corner, to remove the window. this does not
exit you from the browser, it just kills that page.
- Ensure you have tried to find the relevant documentation to solve your problem.
- Check the logbook to see if problem has occurred before, and see if it is helpful
- Call expert for system on which problem occurs
- Call Operations Manager (beeper x4424) (or Robert's cell phone (631) 987-2260)
- If neither respond try calling Project Manager, Peter