Date: __________________
Time: __________________
Person: __________________

  <% if shifttype=1 Then %>

Counting House Checklist L1

Instructions Measurements Actions to Take Comments
Temperature in Electronics Room _______C If >29C page/call Robert  
Check all heaters off YES       NO Turn knob counter-clockwise to low  
Check if
"Detector Status" = (old)
(Si Hybrids may be old if DAQ with Si is not running)
System=_____
___________
If (old) database is not updating.  Check monitor for that particular system, attempt restart if necessary, and notify system expert.  If DAQ is running and Silicon is ON and Si Hybrids is (old) call DAQ expert or Si expert.  

Tunnel Checklist L1

Instructions Measurements Actions To Take Comments
Check Temperature
and Humidity in Tunnel including history (click on number)
~______C

~______%

If  >24C and Humdity>60% ensure ODH fans off. If ODH Fans on call MCR. If still no resolution call Robert.
If rapid variations in temp or humidity follow above proceedure.
 
Check Temperature
and Humidity in Enclosure including history (click on number)
~______C

~______%

If  >24C and Humdity>60% ensure ODH fans off. If ODH Fans on call MCR. If still no resolution call Robert.
If rapid variations in temp or humidity follow above proceedure.

Silicon Monitoring Checklist L1

1. FEC Power Supplies

1.1

Nominal state Actual State Agree?

On c    Off c On c    Off c Yes c   No c If they do not agree , write in logbook, call Si expert.If all FEC Power Supplies are off, jump to section 2.

1.2

If there are FEC Power Supplies ON:

- Are all corresponding indicators in Si Monitor green?

Yes c   No c If not, go to next step. If yes, jump to section 2.

- Do the NOT OK red indicators correspond to voltages?

Yes c   No c If yes, go to manual for appropriate action. 

- Do the NOT OK red indicators correspond to fans?

Yes c   No c If yes, go to manual for appropriate action.

- Do the NOT OK red indicators correspond to currents?

Yes c   No c Check the history graph. If the current is increasing very rapidly, call expert. Otherwise, make note in logbook.

 

2. Bias Power Supplies

2.1

Nominal state Actual State Agree?

On c    Off c On c    Off c Yes c   No c If not, write in logbook, call Si expert. If yes, jump to 3.

2.2

If there are Bias Power Supplies ON:
-Are all corresponding indicators in Si Monitor green?
Yes c   No c If not, write in logbook, call Si expert.

 

3. Cooling System

3.1

Nominal state Actual State Agree?
On c    Off c On c    Off c Yes c   No c If not, write in logbook, call Si expert or Robert. If yes, jump to 4.

3.2

If the Cooling System is ON:
-Are all corresponding indicators in Si Monitor green?
Yes c   No c If not, go to next step. If yes, jump to 4.
- Is there any red flow indicator on any of the subsystems?
Yes c   No c Write in the logbook which indicator is red.
- Are there any other red indicators?
Yes c   No c If yes, report in logbook, call Robert. If not, go to 4.

 

4. UPSs

4.1 

On the Portal, click on UPS, under "Detector Status"

Check that "Output Status" is Online, and "Battery Capacity" is ~100%.

TOF Monitoring Checklist L1

High Voltage To TOF Look at HV_Control.vi on the Plastic computer.    
Nominal TOF Status  Actual TOF Status Agree?  
On c    Off c On c  Off c Yes c  

No c

If they disagree, inform TOF expert

 

Instructions Measurements Comments Actions To Take
TOF Discriminators      
Go to the Camac controls VI. Is X and Q valid? Yes c

No c

If no, read out crates and recheck. If still invalid, note in logbook and restart.
In Tunnel Checks    
Go to the TOF UPS's. TOF UPS's On? Yes c

No c

If No, Call TOF expert.
Look at the TOF Camac crates. Are the crates on? Yes c

No c

If No, Call TOF expert.
  Are discriminators set to remote mode? (Indicated by a red LED on module.) Yes c

No c

If No, note in logbook.
Diagnostic Run Mode Checks      
Go to the 4-fold logic unit in the TOF NIM bin. Look at the UPPER unit only.  Are channels A,B,C and D Off? (Upper part.) Yes c

No c

If no, insert pin into pinholes A, B, C, and D if one isn't present.
Go to the LED HV is located above the HV mainframe. Is LED HV Off? Yes c

No c

If No, dail down, counter clock wise, the HV to zero and disable HV.
Look at the Time Calibrator in the TOF NIM Bin. Is Time Calibrator Off? Yes c

No c

If No, switch off.

Trigger  Monitoring Checklist L1

In Tunnel Checks
The Trigger Racks are those close to the Paddle counters. Camac, Nim bins and fans on? 
(It's alright if the fans on the bottom NIM bins are off) 
Yes c No c If No, contact local trigger expert
Check camac crate voltages are the voltages within range (-+ .3V) ? Yes c No c If No, contact local trigger expert

 

 

High Voltage To TRIGGER counters Look at HV_Control.vi on the Plastic computer.
Nominal State  Actual State Agree? Actions to Take Comments
On c    Off c On c  Off c Yes c No c If they disagree, contact local trigger expert  
High Voltage to ZDC In ZDC HV (pet) window on RHIC X-term. 
Nominal State  Actual State Agree? Actions To Take Comments
On c    Off c On c  Off c Yes c  No c If they disagree, contact local trigger expert  
Nominal and measured voltages agree within 50 volts Yes c  No c If they disagree, contact local trigger expert
Trigger Discriminator Compare image of Camac_Control.vi with nominal state image (under documentation->trigger)
Do the nominal and actual states agree? Actions to Take Comments
Positive Yes c  No c If they disagree, contact local trigger expert
Negative Yes c  No c If they disagree, contact local trigger expert
Electronics Room Check The Trigger Rack is directly in front of the electronics door.
Instructions Actual state Action to Take Comments
Red switches of Fans A, B, C, D On c Off c

 

If Off contact local trigger expert.
Nim bins LED's A ,B , C, D  On c Off c If Off contact local trigger expert.

Radiation Monitor Checklist L1

Instructions Measurements Comments Actions To Take
1.) Click on "Beam Loss Monitors" on portal. Then click on Spikes last 48 hrs. Have there been any spikes in the last 8 hours that have not already been noted in the logbook?
YES ___
NO ___
  Yes: Call MCR to see what was being done during that time and write note in logbook. Then continue to 2.)

No: Continue to 2.)

2.) In "Beam Loss Monitor" page, click on each value in  'Dose' column to view history for that monitor. Check for spuriously high doses 3.6 rad/hr above the base level not already noted in logbook in BLMs (ignore spuriously low values) and in chipmunks. Read documentation for description of base level.   Yes: Call MCR to find out if they were doing anything during that time and write note in logbook. Then continue to 3.)

No: continue to 3.)

3.) Check the nominal status for the radiation monitoring. Does the BLM entry say ON?
YES ___
NO ___
  Yes: Proceed to step 4.)

No: You are done with the check for this subsytem.

4.) Is the Radiation Monitoring Program even open (both BLM and Chipmunks)?
YES ___
NO ___
  Yes: go onto 5.)

No: Double click the icon on the desktop labeled BLMmonitor for the BLM display and Chipmunkmonitor for the Chipmunk display. Click the white arrow in the upper left to run the program and go on to 5.)

5.) Are the charts in the front scrolling (slowly) and do the instant doses and the timestamp on the BLM display appear to be updating?
YES ___
NO ___
  Yes: You are done with the check for this subsystem.

No: Proceed to 6.) in the radiation monitoring documentation.

DAQ Checklist L1

Currently nothing to check

Magnet Checklist L1

Nothing to check for this subsystem

Online Checklist L1

Instructions Measurements Comments Actions To Take

DV Checklist L3

Instructions Measurements Actions To Take Comments
Check "No runs have problems with data tracking" window on phucsia Green     Red/Yellow If Green continue to next line

If Red/Yellow follow instructions on DV page "Checklist instructions"

Check "Runs to be validated" window on phucsia Green     Red/Yellow If Green continue checklist

If Red/Yellow follow instructions on DV page "Checklist instructions"

RHIC X-term Checklist L1

Currently nothing to check

<% Elseif shifttype=2 Then %>

Counting House Checklist L2

Instructions Measurements Actions to Take Comments
Temperature in Electronics Room _______C If >29C page/call Robert  
Check all heaters off YES       NO Turn knob counter-clockwise to low  
Check if
"Detector Status" = (old)
(Si Hybrids may be old if DAQ with Si is not running)
System=_____
___________
If (old) database is not updating.  Check monitor for that particular system, attempt restart if necessary, and notify system expert.  If DAQ is running and Silicon is ON and Si Hybrids is (old) call DAQ expert or Si expert.  

Tunnel Checklist L2

Instructions Measurements Actions To Take Comments
Check Temperature
and Humidity in Tunnel including history (click on number)
~______C

~______%

If  >24C and Humdity>60% ensure ODH fans off. If ODH Fans on call MCR. If still no resolution call Robert.
If rapid variations in temp or humidity follow above proceedure.
 
Check Temperature
and Humidity in Enclosure including history (click on number)
~______C

~______%

If  >24C and Humdity>60% ensure ODH fans off. If ODH Fans on call MCR. If still no resolution call Robert.
If rapid variations in temp or humidity follow above proceedure.

Silicon Monitoring Checklist L2

1. FEC Power Supplies

1.1

Nominal state Actual State Agree?

On c    Off c On c    Off c Yes c   No c If they do not agree , write in logbook, call Si expert.If all FEC Power Supplies are off, jump to section 2.

1.2

If there are FEC Power Supplies ON:

- Are all corresponding indicators in Si Monitor green?

Yes c   No c If not, go to next step. If yes, jump to section 2.

- Do the NOT OK red indicators correspond to voltages?

Yes c   No c If yes, go to manual for appropriate action. 

- Do the NOT OK red indicators correspond to fans?

Yes c   No c If yes, go to manual for appropriate action.

- Do the NOT OK red indicators correspond to currents?

Yes c   No c Check the history graph. If the current is increasing very rapidly, call expert. Otherwise, make note in logbook.

 

2. Bias Power Supplies

2.1

Nominal state Actual State Agree?

On c    Off c On c    Off c Yes c   No c If not, write in logbook, call Si expert. If yes, jump to 3.

2.2

If there are Bias Power Supplies ON:
-Are all corresponding indicators in Si Monitor green?
Yes c   No c If not, write in logbook, call Si expert.

 

3. Cooling System

3.1

Nominal state Actual State Agree?
On c    Off c On c    Off c Yes c   No c If not, write in logbook, call Si expert or Robert. If yes, jump to 4.

3.2

If the Cooling System is ON:
-Are all corresponding indicators in Si Monitor green?
Yes c   No c If not, go to next step. If yes, jump to 4.
- Are there any red flow indicators on any of the subsystems?
Yes c   No c Write in the logbook which indicator is red.
- Are there any other red indicators?
Yes c   No c If yes, report in logbook, call Robert. If not, go to 4.

 

4. UPSs

4.1 

 

On the Portal, click on UPS, under "Detector Status"

Check that "Output Status" is Online, and "Battery Capacity" is ~100%.

 

TOF Monitoring Checklist L2

High Voltage To TOF Look at HV_Control.vi on the Plastic computer.    
Nominal TOF Status  Actual TOF Status Agree?  
On c    Off c On c  Off c Yes c

No c

If they disagree, inform TOF Expert.

 

Instructions Measurements Comments Actions To Take
TOF Discriminators
Go to the Camac controls VI. Is X and Q valid? Yes c

No c

If no, read out crates and recheck. If still invalid, note in logbook and restart vi.
Diagnostic Run Mode Checks
Go to the 4-fold logic unit in the TOF NIM bin. Look at the UPPER unit only.  Are channels A,B,C and D Off? (Upper part.) Yes c

No c

If no, insert pin into pinholes A, B, C, and D if one isn't present.
The LED HV is located above the HV mainframe. Is LED HV Off? Yes c

No c

If No, dail down, counter clock wise, the HV to zero and disable HV.
Look at the Time Calibrator in the TOF NIM Bin. Is Time Calibrator Off? Yes c

No c

If No, switch off.

Trigger  Monitoring Checklist L2

High Voltage To TRIGGER counters Look at HV_Control.vi on the Plastic computer.
Nominal State  Actual State Agree? Actions to Take Comments
On c    Off c On c  Off c Yes c No c If they disagree, contact local trigger expert  
High Voltage to ZDC In ZDC HV (pet) window on RHIC X-term. 
Nominal State  Actual State Agree? Actions To Take Comments
On c    Off c On c  Off c Yes c  No c If they disagree, contact local trigger expert  
Nominal and measured voltages agree within 50 volts Yes c  No c If they disagree, contact local trigger expert
Trigger Discriminator Compare image of Camac_Control.vi with the nominal state (under documentation -> trigger)
Crate Do the nominal and actual states agree? Actions to Take Comments
Positive Yes c  No c If they disagree, contact local trigger expert
Negative Yes c  No c If they disagree, contact local trigger expert
Electronics Room Check The Trigger Rack is directly in front of the electronics door.
Instructions Actual state Action to Take Comments
Red switches of Fans A, B, C, D On c Off c

 

If Off contact local trigger expert.
Nim bins LED's A ,B , C, D  On c Off c If Off contact local trigger expert.

Radiation Monitor Checklist L2

Instructions Measurements Comments Actions To Take
1.) Click on "Beam Loss Monitors" on portal. Then click on Spikes last 48 hrs. Have there been any spikes in the last 8 hours that have not already been noted in the logbook?
YES ___
NO ___
  Yes: Call MCR to see what was being done during that time and write note in logbook. Then continue to 2.)

No: Continue to 2.)

2.) In "Beam Loss Monitor" page, click on each value in  'Dose' column to view history for that monitor. Check for spuriously high doses 3.6 rad/hr above the base level not already noted in logbook in BLMs (ignore spuriously low values) and in chipmunks. Read documentation for description of base level.   Yes: Call MCR to find out if they were doing anything during that time and write note in logbook. Then continue to 3.)

No: continue to 3.)

3.) Check the nominal status for the radiation monitoring. Does the BLM entry say ON?
YES ___
NO ___
  Yes: Proceed to step 4.)

No: You are done with the check for this subsytem.

4.) Is the Radiation Monitoring Program even open (both BLM and Chipmunks)?
YES ___
NO ___
  Yes: go onto 5.)

No: Double click the icon on the desktop labeled BLMmonitor for the BLM display and Chipmunkmonitor for the Chipmunk display. Click the white arrow in the upper left to run the program and go on to 5.)

5.) Are the charts in the front scrolling (slowly) and do the instant doses and the timestamp on the BLM display appear to be updating?
YES ___
NO ___
  Yes: You are done with the check for this subsystem.

No: Proceed to 6.) in the radiation monitoring documentation.

DAQ Checklist L2

Instructions Measurements Comments Actions To Take
1) Make sure DAQ is running. GUI should be visible on the DAQ x-term

YES ____
NO ____

  Yes: Continue checklist 
No: If there isn't a good reason for DAQ not running(development/commissioning), start up the  GUI and DAQ using documentation.
2) Check that Run Status button is Green. 

YES ____
NO ____

  Yes: Make sure Event counter is increasing (updates every 5 seconds) and you are done with the check for this subsytem. Proceed to checking the online systems are running getting data from DAQ.
No: Continue checklist
Is the RUN status Red? YES ____
NO______
DAQ was stopped Yes:The DAQ should usually be running collecting data. Red button indicates No Run in progress. Press STOP run a couple of times and Use the documentation to start a new run of type determined by current beam/detector status.
Nominally 
[RunType=PADDLECOSM, Silicon disabled] for trigger commissioning.
[RunType= ALLBEAM, Silicon enabled] for normal data-taking. 

Refer to documentation if you have problems.
No: (if you have problems) continue checklist

If you pressed Start Run and got no response (most common mode of failure)     Yes:Refer to documentation to restart the GUI and try starting a new run. Make sure RunSetup selections (Silicon enable/disable, Fastbus enable/disable switches) are set properly, and be sure to wait between steps like stopping and starting runs.

Note in the Shift Logbook in as much detail as possible, the conditions under which the freeze occured, so expert can look at it.

If problems persist, call Expert

 

Magnet Checklist L2

Nothing to check

Online Checklist L2

Nothing to Validate

DV Checklist L3

Instructions Measurements Actions To Take Comments
Check "No runs have problems with data tracking" window on phucsia Green     Red/Yellow If Green continue to next line

If Red/Yellow follow instructions on DV "Checklist instructions page"

Check "Runs to be validated" window on phucsia Green     Red/Yellow If Green continue checklist

If Red/Yellow follow instructions on DV "Checklist instructions page"

RHIC X-term  Checklist L2

Currently nothing to check

<% Elseif shifttype=3 Then %>

Counting House Checklist L3

Instructions Measurements Actions to Take Comments
Temperature in Electronics Room _______C If >29C page/call Robert  
Check all heaters off YES       NO Turn knob counter-clockwise to low  
Check if
"Detector Status" = (old)
(Si Hybrids may be old if DAQ with Si is not running)
System=_____
___________
If (old) database is not updating.  Check monitor for that particular system, attempt restart if necessary, and notify system expert.  If DAQ is running and Silicon is ON and Si Hybrids is (old) call DAQ expert or Si expert.  
 

Tunnel Checklist L3

Instructions Measurements Actions To Take Comments
Check Temperature
and Humidity
~______C

~______%

If  >24C and  Humdity>60% ensure ODH fans off. If ODH Fans on call MCR. If still no resolution call Robert.
If rapid variations in temp or humidity follow above proceedure.
 
Check Temperature
and Humidity in Enclosure including history (click on number)
~______C

~______%

If  >24C and Humdity>60% ensure ODH fans off. If ODH Fans on call MCR. If still no resolution call Robert.
If rapid variations in temp or humidity follow above proceedure.

Silicon Monitoring Checklist L3

1. FEC Power Supplies

1.1

Nominal state Actual State Agree?

On c    Off c On c    Off c Yes c   No c If they do not agree , write in logbook, call Si expert.If all FEC Power Supplies are off, jump to section 2.

1.2

If there are FEC Power Supplies ON:

- Are all corresponding indicators in Si Monitor green?

Yes c   No c If not, go to next step. If yes, jump to section 2.

- Do the NOT OK red indicators correspond to voltages?

Yes c   No c If yes, go to manual for appropriate action. 

- Do the NOT OK red indicators correspond to fans?

Yes c   No c If yes, go to manual for appropriate action.

- Do the NOT OK red indicators correspond to currents?

Yes c   No c Check the history graph. If the current is increasing very rapidly, call expert. Otherwise, make note in logbook.

 

2. Bias Power Supplies

2.1

Nominal state Actual State Agree?

On c    Off c On c    Off c Yes c   No c If not, write in logbook, call Si expert. If yes, jump to 3.

2.2

If there are Bias Power Supplies ON:
-Are all corresponding indicators in Si Monitor green?
Yes c   No c If not, write in logbook, call Si expert.

 

3. Cooling System

3.1

Nominal state Actual State Agree?
On c    Off c On c    Off c Yes c   No c If not, write in logbook, call Si expert or Robert. If yes, jump to 4.

3.2

If the Cooling System is ON:
-Are all corresponding indicators in Si Monitor green?
Yes c   No c If not, go to next step. If yes, jump to 4.
- Are there any red flow indicators on any of the subsystems?
Yes c   No c Write in the logbook which indicator is red.
- Are there any other red indicators?
Yes c   No c If yes, report in logbook, call Robert. If not, go to 4.

 

4. UPSs

4.1 

On the Portal, click on UPS, under "Detector Status"

Check that "Output Status" is Online, and "Battery Capacity" is ~100%.

 

5. Alarms

5.1

Is Alarms.vi running?

Yes c   No c If not, double-click the alarms.vi icon on the desktop.

5.2

Can you hear the alarm after pressing the test button?
Yes c   No c If not, try adjusting the volume on the speakers.

TOF Monitoring Checklist L3

High Voltage To TOF Look at HV_Control.vi on the Plastic computer.    
Nominal TOF Status  Actual TOF Status Agree?  
On c    Off c On c  Off c Yes c  

No c

If they disagree, inform TOF expert

 

Instructions Measurements Comments Actions To Take
TOF Discriminators      
Go to the Camac controls VI. Is X and Q valid? Yes c

No c

If no, read out crates and recheck. If still invalid, note in logbook and restart.
Diagnostic Run Mode Checks      
Go to the 4-fold logic unit in the TOF NIM bin. Look at the UPPER unit only.  Are channels A,B,C and D Off? (Upper part.) Yes c

No c

If no, inform TOF expert.
The LED HV is located above the HV mainframe. Is LED HV Off? Yes c

No c

If No, inform TOF expert.
Look at the Time Calibrator in the TOF NIM Bin. Is Time Calibrator Off? Yes c

No c

If No , inform TOF expert.

Trigger  Monitoring Checklist L3

High Voltage To TRIGGER counters Look at HV_Control.vi on the Plastic computer.
Nominal State  Actual State Agree? Actions to Take Comments
On c    Off c On c  Off c Yes c No c If they disagree, contact local trigger expert
High Voltage to ZDC In ZDC HV (pet) window on RHIC X-term. 
Nominal State  Actual State Agree? Actions To Take Comments
On c    Off c On c  Off c Yes c  No c If they disagree, contac local trigger expert  
Nominal and measured voltages agree within 50 volts Yes c  No c If they disagree, contact local trigger expert
Trigger Discriminator Compare image of Camac_Control.vi with nominal state under documentation -> trigger

(click on the square green buttons on top of left-hand window to switch between the positive and negative displays)

Do the nominal and actual states agree? Actions to Take Comments
Positive Yes c  No c If they disagree, contact local trigger expert
Negative Yes c  No c If they disagree, contact local trigger expert

 

Scalers

Record the visual scalers in the chart below.  Do not stop the scalers to make the measurements (make estimates where necessary).  Do not reset the scalers.

Scalers are reset only at 10 am.  Each morning at 10 am, the shift crew should reset the scalers and record the reset time in the online logbook.

Please write any comments you feel pertinent ('start of run', 'middle of long store', 'beams steered in our area', etc.)  

If you want to print this table without printing out the whole checklist, go here.

Date:

Time:

Blue Beam Current ( /10^6 ions):

Yellow Beam Currents (/10^6 ions):

Paddle Negative Sum  
ZDC Negative Sum  
Paddle Positive Sum  
ZDC Positive Sum  
 
PP*PN [wide]  
PP*PN [narrow]  
PP[N]*PN[N] [wide] Nge3  
Cerenkov OR Neg  
 
ZP*ZN[wide]  
ZP*ZN[narrow]  
ZN  
ZP  
 
PP[N] N ge 3  
PP [N ge 1]  
PN[N] N ge 3  
PN [N ge 1]  
 
PP[Nge3]*PN[Nge3]*[PP*PN]  all narrow  
Events Accepted  
ZP*ZN*CC (25 GeV 15 ns) RHIC SCALER  
Triggers Applied  
 
Central  
ZP*ZN (10 GeV 40 ns)  
Accepted Collisions Central  
Cerenkov OR P  

Electronics Room Check The Trigger Rack is directly in front of the electronics door.
Instructions Actual state Action to Take Comments
Red switches of Fans A, B, C, D On c Off c

 

If Off contact local trigger expert.
Nim bins LED's A ,B , C, D  On c Off c If Off contact local trigger expert.

Radiation Monitor Checklist L3

Instructions Measurements Comments Actions To Take
1.) Click on "Beam Loss Monitors" on portal. Then click on Spikes last 48 hrs. Have there been any spikes in the last 8 hours that have not already been noted in the logbook?
YES ___
NO ___
  Yes: Call MCR to see what was being done during that time and write note in logbook. Then continue to 2.)

No: Continue to 2.)

2.) In "Beam Loss Monitor" page, click on each value in  'Dose' column to view history for that monitor. Check for spuriously high doses 3.6 rad/hr above the base level not already noted in logbook in BLMs (ignore spuriously low values) and in chipmunks. Read documentation for description of base level.   Yes: Call MCR to find out if they were doing anything during that time and write note in logbook. Then continue to 3.)

No: continue to 3.)

3.) Check the nominal status for the radiation monitoring. Does the BLM entry say ON?
YES ___
NO ___
  Yes: Proceed to step 4.)

No: You are done with the check for this subsytem.

4.) Is the Radiation Monitoring Program even open (both BLM and Chipmunks)?
YES ___
NO ___
  Yes: go onto 5.)

No: Double click the icon on the desktop labeled BLMmonitor for the BLM display and Chipmunkmonitor for the Chipmunk display. Click the white arrow in the upper left to run the program and go on to 5.)

5.) Are the charts in the front scrolling (slowly) and do the instant doses and the timestamp on the BLM display appear to be updating?
YES ___
NO ___
  Yes: You are done with the check for this subsystem.

No: Proceed to 6.) in the radiation monitoring documentation.

DAQ Checklist L3

Instructions State Actions To Take
Check for flashing yellow lights on top of the Fastbus crate flashing or constantly shining Yes: You are done with the check for this subsytem
No: Continue checklist
Check for Green Status button on the DAQ-GUI on DAQ xterm. 'green' : OK
'red' : No Run
Green: You are done with this subsystem.
Red : Hit Stop Run a couple of times to clear subsystems and Start a new Run.

Magnet Checklist L3

Go to the RHIC X-term computer and find the 'Magnet' control window.  Avoid starting a duplicate window.

Instructions Measurements Actions To Take Comments
Go to Magnet control window on RHIC X-term.  Click on Diagnostics, then Check Readback Mode.  A message with the present value will be added to the message log at bottom of window. [Readback] Mode is

A c  B c

If Readback Mode is set to A, no further action is needed.  If it is B a pop-up will ask whether it should be changed.   If normal running, click Yes, if CAS is working on PS, click No.  

Go to the Magnet Monitoring Program on the 'MAGMON' computer.

Instructions Measurements Actions To Take Comments
Is there a black arrow in window 'MobitorMagnet.vi'? Yes c  No c If NO, click on the 'arrow' to start the VI. Double click on the 'Magnet Monitoring' icon on the desktop if there is no 'MobitorMagnet.vi' window.  
Look at 'StatusStringM' in the window, does the string say 'Off'? Magnet is 

On c  Stby c Off c

If the magnet is 'Off' you can ignore 'Fault' or 'Component Fault' messages.  

Online Checklist L3

Instructions Measurements Actions To Take Comments

RHIC X-term Checklist L3

RHIC X-term Regular check
Check that display of PHOBOS RHIC scalers (Phobos Triggers and Phobos Chipmunks) are updating.

Also check High Voltage (zcal) display.  If red, no reports are being received.

If they are not:  First close the window and attempt to restart from root menu.  If display remains blank (or red):

Weekdays: call MCR and ask them to report to Controls Support that the PHOBOS FEC is down.

Nights & weekends:  Push white button and inform MCR that we have rebooted our RHIC FEC.  If further trouble ask for Support call.

 

<% End If %>