Shifter leader was priyanka saxena Shifters were 1)Dump scheduled for 0100 and was injected successfully but was unexpectedly aborted because of RHIC VACUUM PROBLEM .<br> 2)Beam was restored at 5:13am.Since then we have it.Taken runs from 15383-15399.<br> 3)No detector problem as such.But everytime when TPCs&DCs were ON,A3_XU shows as tripped down.So I ahve to OFF it. _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sat Jun 11 08:04:10 2005
This archive was generated by hypermail 2.1.8 : Sat Jun 11 2005 - 08:04:17 EDT