Shifter leader was SB Shifters were 1. Beam from previous night shift continued throughout the day. RHIC went to machine development around 2:20 pm 2. FS@2.3 deg @1/1A trig2(182k), trig3(574k), trig4(128k), trig5(225k) 3. No major detector problems. Bottom channels 13 and 14 of H2 were incorrectly cabled. Flemming put them back in their orginal configuration. _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Mon Apr 25 16:00:49 2005
This archive was generated by hypermail 2.1.8 : Mon Apr 25 2005 - 16:01:11 EDT