Shifter leader was SB Shifters were 1. Store from previous shift continued until 3:00 am. New store from 5:00 am. 4.25 hours of physics running 2. Runs 14116,14117 with FS @1723A Runs 14118,14119,14120,14122,14123 With FS @861A 3. TPM2 was left out of run during previous shift due to unknown problems. The problem continued into the night shift so TPM2 was out the whole night. _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Tue Apr 19 08:04:01 2005