[Brahms-l] Shift report 20050322 08:00-16:00

From: <apache@brahms-web.brahms.bnl.gov>
Date: Tue Mar 22 2005 - 15:26:57 EST
Shifter leader was BB
Shifters were JHL


Last shift with 62.4 GeV Cu-Cu

Run     Trig1    Trig3   Trig6   M   F   D1     D5
13916    101      195     255    40  4  1723B  700B
13917     24       80      63    40  4  1723B  700B
13918     65      216     114    40  4  1723B  700B
13919     64      208     197    40  4  1723B  700B
13920     65       61     144    40  4   608B  700B
13921    109      176     354    40  4   608B  700B
13922  minimum-bias trig1(204k), trig4(269k), trig6(450k)
13923 non TPC pedestal run
13924 TPC pedestal run

No detector problems

5.5 hours of beam

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Tue Mar 22 15:27:15 2005

This archive was generated by hypermail 2.1.8 : Tue Mar 22 2005 - 15:27:26 EST