Shifter leader was ebj Shifters were 1. RHIC was messing around with the beam for most of this shift. We ended up with 2 hours of beam. 2. I took the two zero field runs at 2.3 degrees. 3. I have started one run with te FS at 6 degrees with the meagnets set to B861. 4. I only noticed one problem with the TOF2 high voltage. I could not reset this channel. _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Sat Feb 26 07:47:42 2005