Shifter leader was HHD Shifters were 1. MCR dumped the first beam before time to steer for STAR. This meant it took some time before the next beam was up and running. No technical issues. 2. Data runs taken with FS@2.3B1723: 13484(104k), 13487(244k), 13488(436k), 13489(283k) Non-TPC pedestal run: 13485 TPC pedestal run: 13486 3. No problems (!). _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Fri Feb 25 23:54:09 2005
This archive was generated by hypermail 2.1.8 : Fri Feb 25 2005 - 23:54:25 EST