Shifter leader was ebj
Shifters were 


1. RHIC has delivered a lot of good beam for most of the shift.  We only used about half of it.

2.  I took two zero field runs at 8 degs. 
    got a non-tpc and a tpc calibration run in. 
    Took some data at 2.3 deg for about 2.5 hours.

3. I noticed some readout problems with the dag, and I used the recipe on the daq computer desk to fix the problem.  
   Like usual, it took me forever to move the FS to 2.3 degrees so we lost 1 hour worth of data. 
   D2 faulted, but magnet support came out to reset it.  