[Brahms-l] Shift report 20050222 08:00-16:00

From: <apache@brahms-web.brahms.bnl.gov>
Date: Tue Feb 22 2005 - 15:57:17 EST
Shifter leader was JHL
Shifters were 


Beam for 2.5 hours for the shift.
Mchine now recovered from QLI and working on Injection.

Data run 13366, 13378, 13379
FS at 8 deg. 2422A
MRS at 40 deg. 1050A

Plan: take 0-field runs for FS at 8 deg.
Move to FS 2.3 deg, and follow the plan.
MRS at 40 deg: collect more statistics for flow measurement   

T1 random triggering problem and TPM2 "Lost sync" problem:
T1 board is now replaced with TPM2 board, and TPM2 board is 
replaced with a "new" board. Hope the problems are fixed.