[Brahms-l] run preparations

From: flemming videbaek <videbaek@rcf.rhic.bnl.gov>
Date: Fri Nov 26 2004 - 11:55:22 EST
This is just a brief update on misc. activities over the last 2 month in preparations for the 
upcoming RHIC run. I hope this is reasonable complete, if something has been forgotten
excuse me.

- DC modules t3 was repaired. (pawel,radek,bob/john,ed)
- Si has been reconfigured for enhanced flow-measurements *(Steve,Bjoern,Hiro)
  {I hope we can have a brief description , as a note what the present geometry is)
- TPC's has been checked out (readout, gasmixture adjusted for proper Vdrift using monitors)
   (Ramiro)
- T1 and T2 are moved closer to shields, to have active volume slight farther way from edges.
  (Ramiro,Ed)
- T1,T2 and T3 surveyed (CA-D; waiting for results)
- BB system chekced out (Burt)
- DAQ and FEH computersystem reconfigured with new machines, different network-config
  -the RUNDB, and web server is now on brahms-rundb0. and brahms-web respectively. The db server is functional, online scripts changed to used these, the web server will be completely functional very soon. (Hiro, Bob)
HV systems have been checked out, (some MF failures on old systems). Filters, fans, NIM, camac
checked out (some still have problems) (Bob, John, Hiro)
The RICH will be refilled just before the run (even though it has held pressure quite well).(Ramiro)


regards
    Flemming





----------------------------------------------------------------
Flemming Videbaek
Physics Department
Brookhaven National Laboratory

e-mail: videbaek@bnl.gov
phone: 631-344-4106



_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Fri Nov 26 11:54:27 2004

This archive was generated by hypermail 2.1.8 : Fri Nov 26 2004 - 11:54:52 EST