[Brahms-l] Fw: Scheduling Physicist News

From: flemming videbaek <videbaek@rcf.rhic.bnl.gov>
Date: Sat Oct 02 2004 - 08:23:23 EDT
There is a new scheduling physicist for run-5 , Christoph Montag,. This
e-mail contains
a link to the RHIC run-5 page. This is a good starting point to check
present schedule and status
for rhic.

Flemming

----------------------------------------------------------------
Flemming Videbaek
Physics Department
Brookhaven National Laboratory

e-mail: videbaek@bnl.gov
phone: 631-344-4106

Sent: Friday, October 01, 2004 2:55 PM
Subject: Scheduling Physicist News


> Hello everybody,
>
> As Kin Yip already announced in his latest email, I'm the FY05 scheduling
> physicist. You may want to take a look at my website,
> http://www.cadops.bnl.gov/SchedPhys/Montag/schedphys.html
> or for those of you outside the C-AD firewall
> http://www.agsrhichome.bnl.gov/SchedPhys/Montag/schedphys.html
>
> **************************************************************************
>
> The NSRL run will end in the late afternoon today. The actual physics run
> there ends at or around 4 PM; afterwards a fault study is scheduled.
>
> **************************************************************************
>
> The RHIC helium cooldown from 80K to 4 K is currently scheduled to start
> on Monday, November 8. About one week later the BLUE ring is expected to
> be ready for first beam at injection energy. Booster/AtR line/AGS will
> start with copper beam on or around November 2.
>
> **************************************************************************
>
> --
>
> Christoph Montag, Brookhaven National Laboratory
> Building 911B, P.O. Box 5000, Upton, NY 11973, U.S.A.
> Phone: +1-631-344-4820
>
>


_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Sat Oct 2 08:18:57 2004

This archive was generated by hypermail 2.1.8 : Sat Oct 02 2004 - 08:19:20 EDT