Hi, Here is a run plan for the extended beam time available next week. This is based on the run plan we made earlier and the discussion we had at the local meeting today at BNL. The main physics goal for the extended beam time is transverse asymmetry measurements at FS 2.3deg. According to the preliminary plan by machine people, beam will be available for physics for about 10 shifts. (Mon. 4pm - Thursday 12:00 pm) FS Program 1. FS 2.3 deg. 1/1B: 2M trigger2 (for pi+) Estimated rate: 50K-100K trigger2 /hr at ZDC~200-300/sec 2. FS 2.3 deg. 1/2B: 0.2M trigger2 This will probably take only a few hours 3. FS 2.3 deg. 0 field (D1:1/2B, D2-D4=0) : 20K trigger2 4. FS 2.3 deg. 1/1A: 0.5M trigger2 or More 1/1B MRS Program 1/2 time: MRS 40deg. 2B 200K trigger3 +MRS 40deg. 6B 1/2 time: MRS 40deg. 2A 200K trigger3 +MRS 40deg. 6A JH _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Thu May 6 15:46:35 2004
This archive was generated by hypermail 2.1.8 : Thu May 06 2004 - 15:46:52 EDT