[Brahms-l] Shift report 20040401 08:00-16:00

From: Apache <apache@bnl.gov>
Date: Thu Apr 01 2004 - 15:51:53 EST
------------------------------------------------------------
Date: Thu Apr  1 15:51:52 2004, Shift: 08:00-16:00
Supervisor: SN, with: 
Log book#15 pages 104 - 104

Shift Summary:
------------------------------------------------------------
1. No beam until 1pm. Low ZDC rate. 2.25 hours of beam

2. RUN      tr3    tr6
   11538  TPC pedestal run
   11539  Non-TPC pedestal run
   11540    30k    28k
   11541     7k     6k
   TOTAL    37k    34k

3. D3 tripped.


------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Thu Apr 1 15:52:33 2004

This archive was generated by hypermail 2.1.8 : Thu Apr 01 2004 - 15:52:58 EST