[Brahms-l] Shift report 20040331 08:00-16:00

From: Apache <apache@bnl.gov>
Date: Wed Mar 31 2004 - 15:51:02 EST
------------------------------------------------------------
Date: Wed Mar 31 15:51:01 2004, Shift: 08:00-16:00
Supervisor: SN, with: 
Log book#15 pages 103 - 103

Shift Summary:
------------------------------------------------------------
1. Beam for 5.25 h. One spontaneous dump.

2. RUN      tr3    tr6
   11492    29k    203k
   11498  TPC pedestal run
   11500  Non-TPC pedestal run
   11501    20k    140k
   11509    12k     22k   At 8 deg.
   11510    20k     35k
   11511     3k      5k
   TOTAL    85k    406k

3. The runserver caused a lot of trouble until Flemming 
   "patched" it

------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Wed Mar 31 15:51:20 2004

This archive was generated by hypermail 2.1.8 : Wed Mar 31 2004 - 15:51:49 EST