FYI ---------------------------------------------------------------- Flemming Videbaek Physics Department Brookhaven National Laboratory ----- Original Message ----- From: "Kin Yip" <kinyip@bnl.gov> To: "Kin Yip" <kinyip@bnl.gov> Sent: Thursday, March 25, 2004 8:18 PM Subject: SPY news update: 62.4 GeV physics run has started ... fates of NSRL/RHIC closely tied together > > ====== Scheduling Physicist -YIP (ie. SPY) news channel ======== > > I come back to the plain text mode. As I have worried, some "loyal" > readers with old mailer softwares did have problems with my graphics > in my email. Those graphics don't really add much value to my email :-) > > ************************************************************ > > (1) Schedule > > Angelika Drees will temporarily take over as the scheduling > physicist this Friday evening. I'll be back on Apr. 5 to resume > the duty of scheduling physicist. > > Let me repeat the concise schedule once again : > > -------------------------------------------------------------------------- -- > -------- > For RHIC : > > * NOW unti Apr. 2 at 08:00 => 62.4 GeV Physics running > > * Apr. 2, 2004 at 08:00 => polarized-proton run starts > -- 1st 4 hours for snake high current test (unless they got a chance to do > it before) > -- During the 4 hours, though RHIC is off, AGS/Booster etc. will be > running. > > * Apr. 5, 2004 at 08:00 => 3 day "Jet Target Installation" starts > Apr. 7, 2004 at 18:00 => This ends for most people except perhaps > the > Jet Target group if > they are not ready. > > -- RHIC will be off during the 3 days. > -- 1st 8 hours on Apr. 5, AGS will be opened. Otherwise, AGS will be > closed for running. > -- Booster will be running (as NSRL needs it !) > -------------------------------------------------------------------------- -- > ------ > > NSRL is running all the time (mostly Mon. to Fri.) until Apr. 22. > > ************************************************************ > > (2) 200 GeV gold run has ended and 62.4 run has started > > The 200 GeV gold-gold run ended at ~09:30 on Mar. 24. > > After ONLY a day plus a couple hours, the machine development > for the 62.4 GeV has finished. The 62.4 GeV physics run has > started today (Mar. 25) ~14:00. We had some minor delay on > Wed. before the machine development could actually start. > > I saw Angelika jump right in to do vernier scan in the first store > for all 4 experiments. > > At the time of writing, there is some difficulty to deliver the > 2nd physics store ... let's hope this will be over soon. > > ************************************************************ > > (3) Fates of NSRL/RHIC closely tied together ..... > > This past Tuesday (Mar. 23) has been the best day so far for NSRL (NASA) > in the sense that they finished all the expts. before 21:30 --- breaking > the midnight rule for the 1st time in this run. > > Independently of the above, unfortunately, on the same day, the last day > for the 200 GeV energy gold-gold run didn't go very well. There was no > real good store (say, longer than 20 minutes) after ~noon until almost > 15 hours later, next day in the morning. > > In case you don't realize .... NSRL could run successfully on Tuesday > because we were in the so-called PPM (pulse-to-pulse-modulation) mode. > In this mode, one Tandem provided carbon beams (for example) for > NSRL whereas the other Tandem provided the gold beams for RHIC. > > >From now until the lower energy gold-gold run ends on Apr. 2, the PPM > mode is NOT feasible for the combination of gold and iron beams. > The NSRL operation has to be stopped during the RHIC injection. > If we were running iron beams on Tuesday without the PPM, NSRL > would be probably waiting and waiting from 15 hours in vain > as RHIC was doing injection essentially all the time. > > After RHIC injection finishes, we do a "mode-switch" (changing the magnetic > field and other parameters in the Tandem transfer line) and allow iron > beams to be transferred from the Tandem to the Booster and to NSRL. > > Needless to say, the fates of RHIC and NSRL are closely tied together > from now on until Apr. 2. How good the NSRL run will be in the next > ~7 days depends considerably on how smoothly RHIC works !! > > After Apr. 2, another kind of PPM mode (between a Tandem and the > Linear Accelerator) will be used and NSRL can be run all the time > even during RHIC injection. Their "special bonding" will be broken. > > ************************************************************ > > (4) As usual, the next Time meeting is next Tuesday (Mar. 30, 2004) > at 13:30 in the Snyder Seminar Room. > > I am advertising this for Angelika. > > ====== ======= ====== ======= ====== ======= ====== ======= > > This SPY news channel solicits YOUR input of any sorts. > You'll be paid back with loads of gratefulness :-) > > Let me know if you want to get out of this private email mailing list. > > SPY's webpage : > > http://www.c-ad.bnl.gov/kinyip/SchedPhys/ > > ================================================================= > > Disclaimer: Whatever is being said here is not always 100% accurate > though I try my best to avoid being 100% inaccurate :-) > _______________________________________________ Brahms-l mailing list Brahms-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-lReceived on Thu Mar 25 20:39:34 2004
This archive was generated by hypermail 2.1.8 : Thu Mar 25 2004 - 20:40:07 EST