[Brahms-l] Shift report 20040323 08:00-16:00

From: Apache <apache@bnl.gov>
Date: Tue Mar 23 2004 - 16:01:57 EST
------------------------------------------------------------
Date: Tue Mar 23 16:01:56 2004, Shift: 08:00-16:00
Supervisor: SN, with: CEJ
Log book#15 pages 96 - 96

Shift Summary:
------------------------------------------------------------
1. Beam for 4 hours.

2. RUN      tr2    tr3
   11263  Zero-field run
   11264  Zero-field run
   11265    30k    100k
   11267  Special run (Flemming)
   11268    40k    142k
   11269    22k    107k
   11276  TPC pedestal   
   11277  Non-TPC pedestal
   11278    29k    51k (Beam spontaneously dumped.)

3. A corrector trip resulted in the beam being dumped 
   prematurely around 12.
   Spontaneous dump at 15.40 due to RHIC quench interlock.


------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Tue Mar 23 16:02:12 2004

This archive was generated by hypermail 2.1.8 : Tue Mar 23 2004 - 16:02:36 EST