[Brahms-l] Shift report 20040313 00:00-08:00

From: Apache <apache@bnl.gov>
Date: Sat Mar 13 2004 - 08:09:40 EST
------------------------------------------------------------
Date: Sat Mar 13 08:09:40 2004, Shift: 00:00-08:00
Supervisor: CH, with: 
Log book#15 pages 86 - 86

Shift Summary:
------------------------------------------------------------
1: Beam mot of the time.   Low intensity run at the end.

2: Fulfilled 1 / sqrt(8) A FS 10 deg. goal
   MRS @ 90 1/1 fieldA almost done 
   TPC pedestal
   Normal pedestal
 
3: The daq is acting up
------------------------------------------------------------

_______________________________________________
Brahms-l mailing list
Brahms-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-l
Received on Sat Mar 13 08:09:51 2004

This archive was generated by hypermail 2.1.8 : Sat Mar 13 2004 - 08:10:14 EST